The landfill is constructed as a [[Containment Facility]], utilizing the underlying clay materials as the principal barrier. The [[Landfill Lining System]] is augmented with a flexible membrane liner of High Density Polyethylene (HDPE) on the base and the lower part of the sidewalls. The sidewalls are steeply graded and required buttressing to enable construction within the 30 meter deep quarry.
The landfill is constructed as a [[Containment Facility]], utilizing the underlying clay materials as the principal barrier. The [[Landfill Lining System]] is augmented with a flexible membrane liner of High Density Polyethylene (HDPE) on the base and the lower part of the sidewalls. The sidewalls are steeply graded and required buttressing to enable construction within the 30 meter deep quarry.


There is [[Landfill Gas]] power generation with electricity export to the [[National Grid]]. Installed capacity is 4.89MWhttps://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx?ReportPath=/DatawarehouseReports/CertificatesExternalPublicDataWarehouse&ReportVisibility=1&ReportCategory=2
There is [[Landfill Gas]] power generation with electricity export to the [[National Grid]]. Installed capacity is 4.89MW. [https://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx?]


[[Viridor]] have been unable to secure a connection to the local sewerage system, principally due to a lack of local treatment capacity at the receiving [[Sewage Treatment Works]]. Consequently, [[Leachate]] produced by the site is removed by tanker to appropriately permitted [[Sewage Treatment Works]].
[[Viridor]] have been unable to secure a connection to the local sewerage system, principally due to a lack of local treatment capacity at the receiving [[Sewage Treatment Works]]. Consequently, [[Leachate]] produced by the site is removed by tanker to appropriately permitted [[Sewage Treatment Works]].