Blackburn Meadows Renewable Energy Plant: Difference between revisions

Bin52 (talk | contribs)
m tonnage data added
Wikiwaster123 (talk | contribs)
mNo edit summary
Line 3: Line 3:
[[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__
[[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__
<br clear='left'/>
<br clear='left'/>
<ref>[https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html/ Blackburn Meadows CHP Site Photo]All Rights Reserved</ref>


==Summary==
==Summary==
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works<ref name="ref1" >E.ON, 2020. [https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020].]</ref>.
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works<ref name="ref1" >E.ON, 2020. [https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020]].</ref>.


The Blackburn Meadows facility is operated by [[E.ON Energy]] and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020].</ref>.
The Blackburn Meadows facility is operated by [[E.ON Energy]] and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020]].</ref>.


==Plant==
==Plant==
Line 14: Line 15:
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated<ref name="ref2"/>.
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated<ref name="ref2"/>.


The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020].</ref>.
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>.


==Tonnage Input/Fuel==
==Tonnage Input/Fuel==