Hazardous Landfill: Difference between revisions
mNo edit summary |
m minor text change |
||
Line 1: | Line 1: | ||
[[Category:Technologies & Solutions]] | [[Category:Technologies & Solutions]] | ||
Only a Hazardous Landfill can accept [[Hazardous Waste]] for [[Landfill]] [[Disposal]] but only then if it meets the relevant standards for engineering and management controls and [[Waste Acceptance Criteria]] set out in the Annex to the Decision, but it may also be able to accept small quantities of [[ Inert Waste]]. Hazardous landfill sites cannot accept [[Non-Hazardous Waste]]. There are some restricted circumstances in which [[Non- | Only a Hazardous Landfill can accept [[Hazardous Waste]] for [[Landfill]] [[Disposal]] but only then if it meets the relevant standards for engineering and management controls and [[Waste Acceptance Criteria]] set out in the Annex to the Decision, but it may also be able to accept small quantities of [[ Inert Waste]]. Hazardous landfill sites cannot accept [[Non-Hazardous Waste]]. There are some restricted circumstances in which [[Non-hazardous Landfill]] can accept [[Hazardous Waste]], these are described further below. | ||
There are numerical limit values for leachable inorganic substances, organic content along with standards for physical stability. These exist for both granular and monolithic hazardous waste. | There are numerical limit values for leachable inorganic substances, organic content along with standards for physical stability. These exist for both granular and monolithic hazardous waste. | ||
Standards require [[Hazardous Waste]] that is disposed of with other [[Non- | Standards require [[Hazardous Waste]] that is disposed of with other [[Non-Hazardous Waste]] to be in separate engineered cells within the Landfill where stable non-reactive [[Hazardous Waste]] or [[Gypsum Waste]] (normally plasterboard) is to be disposed of<ref>Defra, 2010. [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/69347/pb13563-landfill-directive-100322.pdf Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs], p.7.</ref>. | ||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 08:59, 17 November 2020
Only a Hazardous Landfill can accept Hazardous Waste for Landfill Disposal but only then if it meets the relevant standards for engineering and management controls and Waste Acceptance Criteria set out in the Annex to the Decision, but it may also be able to accept small quantities of Inert Waste. Hazardous landfill sites cannot accept Non-Hazardous Waste. There are some restricted circumstances in which Non-hazardous Landfill can accept Hazardous Waste, these are described further below.
There are numerical limit values for leachable inorganic substances, organic content along with standards for physical stability. These exist for both granular and monolithic hazardous waste.
Standards require Hazardous Waste that is disposed of with other Non-Hazardous Waste to be in separate engineered cells within the Landfill where stable non-reactive Hazardous Waste or Gypsum Waste (normally plasterboard) is to be disposed of[1].