Beddington Farmlands Landfill Site: Difference between revisions

Howard (talk | contribs)
Howard (talk | contribs)
Line 29: Line 29:


Other Infrastructure
Other Infrastructure
Elsewhere within the quarry complex, Viridor also developed an In-vessel Composting (IVC) facility to deal with some of Devon County Council's separately collected Green Waste. This facility is no longer in operation and has been converted to be used a Waste Transfer Station.
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste MRF, an In-vessel Composting (IVC) facility and an Energy-from-Waste facility. Several of these facilities are associated with contracts with the South London Waste Partnership.


==Title==
==Title==