There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 5.05W.<ref>[https://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx? [[Ofgem]] Summary of Installed Capacity]</ref>
There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 5.05W.<ref>[https://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx? [[Ofgem]] Summary of Installed Capacity]</ref>


Viridor discharge leachate to the local sewerage system which discharges to the adjoing sewage tretament works. In 2019, it was proposed to install a methane stripping plant to pre-treat the leachate prior to discharge.
Viridor discharge leachate to the local sewerage system which discharges to the adjoining sewage treatment works. In 2019, it was proposed to install a methane stripping plant to pre-treat the leachate prior to discharge.


Other Infrastructure