Beddington Farmlands Landfill Site: Difference between revisions
Line 28: | Line 28: | ||
There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 5.05W.<ref>[https://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx? [[Ofgem]] Summary of Installed Capacity]</ref> | There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 5.05W.<ref>[https://renewablesandchp.ofgem.gov.uk/Public/ReportViewer.aspx? [[Ofgem]] Summary of Installed Capacity]</ref> | ||
Viridor discharge leachate to the local sewerage system which discharges to the | Viridor discharge leachate to the local sewerage system which discharges to the adjoining sewage treatment works. In 2019, it was proposed to install a methane stripping plant to pre-treat the leachate prior to discharge. | ||
Other Infrastructure | Other Infrastructure |