Vine Street EfW (Kirkless EfW): Difference between revisions

From Wikiwaste
Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
Line 10: Line 10:


==Plant==
==Plant==
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002.
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EFW]]. The facility commenced operation in 2002.
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.



Revision as of 12:59, 16 December 2020

Suez Kirklees
Suez Kirklees


Vine Street EfW (Kirkless EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ6178IX
Operator SUEZ
Region Yorkshire and the Humber
Operational Capacity 135ktpa
Is site R1? fal
When was R1 Granted? 2017-04-05
What was the R1 value 0.66
Electrical Capacity 9.50MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 127510.00 0.00 0.00 0.00 127510.00
2017 132448.00 0.00 0.00 0.00 132448.00
2018 124476.60 0.00 0.00 0.00 124476.60
2019 129599.00 4066.00 278.00 0.00 133943.00
2020 121147.00 2739.00 343.00 0.00 124229.00
2021 132156.00 1652.00 775.00 0.00 134583.00
2022 118915.00 587.00 710.00 0.00 120212.00
2023 127556.00 3963.00 860.00 0.00 132379.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 25528.00 20.02% 5114.00 4.01%
2017 26852.00 20.27% 4915.00 3.71%
2018 25074.00 20.14% 4713.00 3.79%
2019 26098.00 19.48% 5001.00 3.73%
2020 25794.00 20.76% 4441.00 3.57%
2021 47041.00 34.95% 8260.00 6.14%
2022 24055.00 20.01% 4058.00 3.38%
2023 25643.00 19.37% 4619.00 3.49%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by Suez. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste.

History

The Kirklees facility, in Huddersfield, was built primarily to service Kirklees Metropolitan Council under a 25 year PFI contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)[1].

Plant

The plant is assumed to have been built by Lentjes (renamed Lurgi in 2006 and sold to A-Tec Industries AG in 2007) under a turnkey contract with a similar approach to Allington EFW. The facility commenced operation in 2002. The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual Household Waste and Commercial Waste. The technology is understood to be capable of operating in a range of CV of between 6.5 and 30.0 MJ/kg depending on configuration[2].

Local Authority Users

The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage
Kirklees MBC 120817.963

References