Allington EFW: Difference between revisions
No edit summary |
m add new link |
||
| Line 5: | Line 5: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allington site has permitted operational capacity of 500,000 tonnes per annum, and is owned and operated by [[Kent Enviropower]] a subsidiary of [[FCC Environment]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[http://www.fccenvironment.co.uk/green-energy/envirecover/ FCC Environment Website]</ref>. | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allington site has permitted operational capacity of 500,000 tonnes per annum, and is owned and operated by [[Kent Enviropower (FCC Environment)|Kent Enviropower]] a subsidiary of [[FCC Environment]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[http://www.fccenvironment.co.uk/green-energy/envirecover/ FCC Environment Website]</ref>. | ||
==History== | ==History== | ||