Four Ashes EfW (Staffordshire ERF) (W2R): Difference between revisions
m layout |
No edit summary |
||
Line 17: | Line 17: | ||
==Local Authority Users== | ==Local Authority Users== | ||
The following | The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy | {{#get_db_data: db=engy |
Revision as of 12:58, 17 December 2020
Four Ashes EfW (Staffordshire ERF) (W2R) Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | HP3431HK |
Operator | Veolia |
Region | West Midlands |
Operational Capacity | 340ktpa |
Is site R1? | fal |
When was R1 Granted? | 2015-01-10 |
What was the R1 value | 0.73 |
Electrical Capacity | 39.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PFI |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 307743.00 | 32203.00 | 0.00 | 0.00 | 339946.00 |
2017 | 303968.00 | 33733.00 | 0.00 | 0.00 | 337701.00 |
2018 | 313866.00 | 22583.00 | 0.00 | 0.00 | 336449.00 |
2019 | 336725.00 | 432.00 | 135.00 | 69.00 | 337361.00 |
2020 | 335621.00 | 313.00 | 0.00 | 245.00 | 336179.00 |
2021 | 329562.00 | 241.00 | 29.00 | 0.00 | 329832.00 |
2022 | 277952.00 | 26423.00 | 1.30 | 33679.00 | 338055.30 |
2023 | 327040.00 | 41.00 | 0.00 | 211.00 | 327292.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 69028.00 | 20.31% | 8698.00 | 2.56% |
2017 | 66518.00 | 19.70% | 8267.00 | 2.45% |
2018 | 65857.00 | 19.57% | 8227.00 | 2.45% |
2019 | 63613.00 | 18.86% | 8640.00 | 2.56% |
2020 | 64617.00 | 19.22% | 7530.00 | 2.24% |
2021 | 64882.00 | 19.67% | 8038.00 | 2.44% |
2022 | 64678.00 | 19.13% | 7889.00 | 2.33% |
2023 | 63071.00 | 19.27% | 7742.00 | 2.37% |
Summary
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Staffordshire in the West Midlands of England, the Four Ashes EfW has a permitted operational capacity of 340,000 tonnes per annum, producing up to 29 MW that supplies the EfW's own energy needs, exporting the rest to the grid (23 MW). The facility is owned and operated by Veolia. Feedstock for the facility is primarily locally sourced residual Household Waste, with the delivery method being through road transport[1].
History
Veolia received planning permission to build the facility at Four Ashes in February 2011 after modifying its proposals to include a smaller chimney stack and lower roof[2]. Construction of the plant began in August 2011[2], leading to the official opening, carried out by HRH The Duke of Gloucester KG GCVO, and commencement of operations of the facility taking place on Wednesday 14th May 2014[1].
In December 2014 Veolia seeked permission from Staffordshire County Council’s Planning Authority to increase the tonnage of waste that is delivered to the Four Ashes site from 300,000 to 340,000 tonnes per annum[1].
Plant
This facility was developed under a 25 year Public Finance Initiative (PFI) contract worth £1 billion for residual waste treatment and disposal, signed by Staffordshire County Council in July 2010 it was the biggest in Staffordshire County Council’s history[2].
The facility has been built with technologies developed by Veolia in partnership with CNIM Clugston Staffordshire Ltd, with the EPC work carried out by CNIM. The combustion technology comprises of two 20 t/h incineration lines of the CNIM/Martin GmbH reverse-acting grate system with two lines, a CNIM-designed horizontal boiler and a SecoLAB© flue ash treatment system supplied by LAB, a Group CNIM company[3].
Local Authority Users
The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|---|
Birmingham City Council | 1942.940 |
Caerphilly CBC | 100.760 |
Norfolk County Council | 146.140 |
Sandwell MBC | 58396.890 |
Shropshire | 2327.580 |
Staffordshire County Council | 142803.280 |
Telford and Wrekin Council | 1113.700 |
Walsall MBC | 64208.320 |
References
- ↑ 1.0 1.1 1.2 Veolia, 2020. Home page. Online. Veolia Staffordshire. [Accessed 7 Feb. 2020.]
- ↑ 2.0 2.1 2.2 Lets Recycle, 2013. Veolias Four Ashes EfW to open by end of 2013 - letsrecycle.com. Online. letsrecycle.com. [Accessed 7 Feb. 2020.]
- ↑ CNIM, 2016. A turnkey energy recovery facility at Four Ashes | CNIM. Online. Cnim.com.[Accessed 7 Feb. 2020.]