Cornwall ERC: Difference between revisions

From Wikiwaste
Arctellion (talk | contribs)
No edit summary
No edit summary
Line 14: Line 14:


==Local Authority Users==
==Local Authority Users==
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
{{#get_db_data: db=engy

Revision as of 12:59, 17 December 2020

Suez Cornwall
Suez Cornwall


Cornwall ERC
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence GP3433GH
Operator SUEZ
Region South West
Operational Capacity 240ktpa
Is site R1? fal
When was R1 Granted? 2020-02-03
What was the R1 value 0.76
Electrical Capacity 24.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 35830.10 0.00 12.08 151587.25 187429.43
2018 41681.71 0.00 223.36 179672.34 221577.41
2019 153899.00 89357.00 20.00 0.00 243276.00
2020 162489.00 82086.00 0.00 0.00 244575.00
2021 168449.00 78777.00 0.00 0.00 247226.00
2022 154896.00 90780.00 0.00 0.00 245676.00
2023 156149.00 87302.00 0.00 0.00 243451.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 44012.64 23.48% 4447.50 2.37%
2018 41677.54 18.81% 5705.32 2.57%
2019 45524.00 18.71% 6200.00 2.55%
2020 47909.00 19.59% 5613.00 2.30%
2021 47041.00 19.03% 5716.00 2.31%
2022 43011.00 17.51% 5092.00 2.07%
2023 38473.00 15.80% 5030.00 2.07%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Cornwall has permitted operational capacity of 249,000 tonnes per annum, operated and owned by Cornwall Energy Recovery Ltd, owned by Pensions Infrastructure Platform, i-Environment Investments and Suez with the latter operating the facility. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1]

History

The Cornwall facility was built as part of a PFI contract with Cornwall Council which runs to 2039 and includes the operation of HWRC sites and MRFs in the county. The tonnage provided requires a large proportion of tonnage to be sourced from outside Cornwall, which has proved controversial[2]. It is located on the outskirts of St. Dennis and has been operational since March 2017[3].

Plant

Built by Vinci Environment UK (a 50/50 subsidiary of Vinci Construction UK and Vinci Environment) under a Design & Build-turnkey contract, construction was completed in March 2018 at a reported[4] £141m capital cost. The plant comprises 2 lines via standard combustion technology, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste generating 16.6MWe of power [5].

Local Authority Users

The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage

References