Parc Adfer EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
==Local Authority Users== | ==Local Authority Users== | ||
The following | The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy | {{#get_db_data: db=engy |
Revision as of 12:59, 17 December 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
The Parc Adfer Energy from Waste facility was developed by and is operated by Wheelabrator Technologies, located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a CHP plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the North Wales Residual Waste Treatment Project[1].
History
Wheelabrator Technologies was selected as the preferred bidder to build and operate the Parc Adfer EfW in 2014, entering into a 25 year contract as a Public Private Partnership (PPP). Support was given by the Welsh Government as the facility serves the five local authorities that make up the North Wales Residual Waste Treatment Project (NWRWTP). Planning consent was granted by Flintshire County Council in May 2015, and the environmental permit was granted by Natural Resources Wales in October 2015, leading financial close being reached and construction beginning in December 2016 with the full commercial operations starting December 2019[1].
Plant
The process technology and the EPC for the plant was supplied by CNIM, with Clungston responsible for the civil engineering works. The project was initiated by the Welsh Government and the North Wales Residual Waste Treatment Project Partnership to achieve long-term targets for recycling and diversion of waste from landfill for Flintshire County Council, Isle of Anglesey County Council, Gwynedd County Council, Conwy County Borough Council, Denbighshire County Council[1].
The project financing was £180 million which was supplied with a 23-year term loan from the Green Investment Bank, MUFG, Natixis and Siemens, with an equity bridging loan provided by Barclays[1].
Local Authority Users
The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|
References
- ↑ 1.0 1.1 1.2 1.3 Wheelabrator, 2020. About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]