Rookery Pit Energy Recovery Facility (Rookery South): Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m minor text change
Bin52 (talk | contribs)
m add pic
Line 1: Line 1:
[[File:Rookery.png|300px|left|Image of Rookery Pit ERF]]
[[File:Rookery South.png|400px|left|Rookery South Energy Recovery Facility under construction in December 2020 - Rookery South Newsletter, all rights reserved]]__TOC__
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#03|id=47}}
{{EfWTemplate|EPR=Tbc#03|id=47}}
 
<br clear='left'/>
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Rookery Pit ERF has a permitted capacity of 585,000 tonnes per annum. The project is being developed by [[Covanta]] and is owned by [[Covanta]] (80%), [[Veolia]] (20%) and [[Covanta]] and [[Green Investment Group]] (80%).
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Rookery Pit ERF has a permitted capacity of 585,000 tonnes per annum. The project is being developed by [[Covanta]] and is owned by [[Covanta]] (80%), [[Veolia]] (20%) and [[Covanta]] and [[Green Investment Group]] (80%).

Revision as of 07:45, 17 March 2021

Rookery South Energy Recovery Facility under construction in December 2020 - Rookery South Newsletter, all rights reserved
Rookery South Energy Recovery Facility under construction in December 2020 - Rookery South Newsletter, all rights reserved


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

An EfW facility based upon conventional combustion technology and presently in early stage construction. Rookery Pit ERF has a permitted capacity of 585,000 tonnes per annum. The project is being developed by Covanta and is owned by Covanta (80%), Veolia (20%) and Covanta and Green Investment Group (80%).

Technology

The plant technology will comprise standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating and 60MWe [1].

Construction

The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an EPC turnkey arrangement with Hitachi Zosen Inova technology. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of the Environmental Permit [2].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste provided by Veolia.