Canford: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational and so this plant has been classified as under construction, but no construction is understood to have progressed on the site.
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.


==Technology==
==Technology==