Newhurst EFW: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m add new link
Bin52 (talk | contribs)
m minor text change
Line 6: Line 6:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum. The project is being developed by [[Covanta]] who will be the operator of the facility when constructed. The facility is 50% owned by [[Covanta]] and [[Macquarie]]'s [[Green Investment Group]] and 50% by [[Biffa]]<ref>[https://www.circularonline.co.uk/news/financial-close-achieved-on-newhurst-energy-from-waste-plant/ Circular Magazine Article]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology that reached financial close in February 2020. [[Newhurst EFW]] has a permitted capacity of 350,000 tonnes per annum. The project is being developed by [[Covanta]] who will be the operator of the facility when constructed. The facility is 50% owned by [[Covanta]] and [[Macquarie]]'s [[Green Investment Group]] and 50% by [[Biffa]]<ref>[https://www.circularonline.co.uk/news/financial-close-achieved-on-newhurst-energy-from-waste-plant/ Circular Magazine Article]</ref>.


==Technology==
==Technology==
The plant technology will comprise standard moving grate technology, producing super-heated steam, generating 42MWe.  
The plant technology will comprise standard moving [[grate]] technology, producing super-heated steam, generating 42MWe.  


==Construction==
==Construction==

Revision as of 15:39, 17 March 2021

Newhurst EFW Artist Image - source Circular Online Magazine
Newhurst EFW Artist Image - source Circular Online Magazine


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

An EfW facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum. The project is being developed by Covanta who will be the operator of the facility when constructed. The facility is 50% owned by Covanta and Macquarie's Green Investment Group and 50% by Biffa[1].

Technology

The plant technology will comprise standard moving grate technology, producing super-heated steam, generating 42MWe.

Construction

The plant reached financial close in February 2020 and will delivered under a turnkey EPC arrangement with Hitachi Zosen Inova technology over a 39 month programme with technical oversight by Covanta[2][3].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste with 70% provided from Biffa's existing local waste collection services.

References