Kemsley K3 EfW: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m Bin52 moved page K3 CHP Facility (Kemsley EfW) to Kemsley K3 EfW: Owner has changed name
Bin52 (talk | contribs)
m add new link
Line 1: Line 1:
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#05|id=49}}
{{EfWTemplate|EPR=JP3135DK|id=49}}
[[File:Kemsley K3.jpg|350px|left|Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved]]__TOC__
[[File:Kemsley K3.jpg|350px|left|Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved]]__TOC__
<br clear='left'/>
<br clear='left'/>

Revision as of 07:57, 29 March 2021


Kemsley K3 EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence JP3135DK
Operator Enfinium K3 CHP Operations Ltd
Region South East
Operational Capacity 657ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.82
Electrical Capacity 45.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 178290.00 188931.00 0.00 51992.00 419213.00
2021 278529.00 128625.00 0.00 119875.00 527029.00
2022 321040.00 81704.00 0.00 139885.00 542629.00
2023 285880.00 94000.00 0.00 183227.00 563107.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 93632.00 22.34% 12447.00 2.97%
2021 115045.00 21.83% 15664.00 2.97%
2022 119607.00 22.04% 15223.00 2.81%
2023 119858.00 21.29% 14484.00 2.57%

Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved
Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved


Summary

An EfW facility based upon conventional combustion technology, Kemsley K3 EfW was handed over for operation in July 2020[1] and had an original operational capacity of 550,000 tonnes per annum with an extension of 107,000 tonnes per annum approved in February 2021[2]. The project has been developed and will be operated by Wheelabrator and was funded by the Green Investment Bank, BTMU, Natixis and Investec. The project reached financial close in September 2016 for GBP £340m[3]..

History

The additional permitted capacity was sought as part of an application for an additional project adjacent to the site (Kemsley North (WKN)) although this part of the application was refused by the Planning Inspectorate. The extension to the Kemsley K3 EfW was within the boundaries of the current consent and technology, through improved efficiency of the plant design, to allow the processing of the further 107,000 tones per annum to generate an additional 25.1MW.

In December 2020 Wheelabrator announced the sale of their UK energy from waste division to the European Diversified Infrastructure Fund III, a fund managed by First Sentier Investors (FSI) (formally known as First State Investments) headquartered in Australia[4] for completion in early 2021.

Technology

The plant technology comprises 2 lines of a standard combustion moving grate technology, producing super-heated steam (49.9MW plus 25.1MW of thermal output) to generate electricity to grid and steam to the adjacent DS Smith papermill.

Construction

The plant gained planning consent in 2012, reached financial close in July 2016, and was delivered by an EPC turnkey arrangement with CNIM. Handover was achieved in July 2020.

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste sourced by Wheelabrator.

References