==Plant== | ==Plant== | ||
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract which started in summer 2008 and was delivered in 2010 at a reported <ref>[https://www.hz-inova.com/files/2014/11/hzi_ref_riverside-en.pdf Hitachi Zosen Inova pdf]</ref> EU400m capital cost. | Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract which started in summer 2008 and was delivered in 2010 at a reported <ref>[https://www.hz-inova.com/files/2014/11/hzi_ref_riverside-en.pdf Hitachi Zosen Inova pdf]</ref> EU400m capital cost. | ||
The plant comprises 3 lines of 31.8 tonnes/hour design capacity capable of treating 585,000 tonnes per annum via standard [[combustion]] technology, air cooled, [Hitachi Zosen Inova]] [[Grate]] R-1000104, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] with a [[CV]] of between 7 and 13MJ/kg to deliver 65MWe of power. | The plant comprises 3 lines of 31.8 tonnes/hour design capacity capable of treating 585,000 tonnes per annum via standard [[combustion]] technology, air cooled, [[Hitachi Zosen Inova]] [[Grate]] R-1000104, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] with a [[CV]] of between 7 and 13MJ/kg to deliver 65MWe of power. | ||
==Local Authority Users== | ==Local Authority Users== | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||