An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and considered an [[ERF]] based on its [[R1]] status. The [[EfW]] element of the facility at Glasgow has permitted operational capacity of 150,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road to a regeneration site at Polmadie in the south of the city <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/glasgow-rrec/ Viridor Website]</ref>.
{{EfWTemplate|EPR=PPC/A/1110002|id=32}}
{{EfWTemplate|EPR={{#var:epr}}|id=32}}[[File:Viridor Glasgow.png|400px|left|Viridor Glasgow]]__TOC__<br clear='left' />
 
==Summary==
==Summary==
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and considered an [[ERF]] based on its [[R1]] status. The [[EfW]] element of the facility at Glasgow has permitted operational capacity of 150,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road to a regeneration site at Polmadie in the south of the city <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/glasgow-rrec/ Viridor Website]</ref>.
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and considered an [[ERF]] based on its [[R1]] status. The [[EfW]] element of the facility at Glasgow has permitted operational capacity of 150,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road to a regeneration site at Polmadie in the south of the city <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/glasgow-rrec/ Viridor Website]</ref>.
Line 13: Line 12:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='PPC/A/1110002'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />