Wolverhampton EfW: Difference between revisions

Bin52 (talk | contribs)
m update layout and link
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
{{#vardefine: epr|AP3835SM}}
{{#vardefine: epr|AP3835SM}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Wolverhampton has permitted operational capacity of 118,000 tonnes per annum.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Wolverhampton has permitted operational capacity of 118,000 tonnes per annum.
{{EfWTemplate|EPR={{#var: epr}}|id=35}}
{{EfWTemplate|EPR={{#var: epr}}|id=35}}[[File:Wolverhampton.png|200px|left|Wolverhampton EFW]]__TOC__<br clear='left'/>
[[File:Wolverhampton.png|200px|left|Wolverhampton EFW]]__TOC__
<br clear='left'/>
 
==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Wolverhampton has permitted operational capacity of 118,000 tonnes per annum. The facility is operated by [[MES Environmental]], now part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/wolverhampton/ MSES Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Wolverhampton has permitted operational capacity of 118,000 tonnes per annum. The facility is operated by [[MES Environmental]], now part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/wolverhampton/ MSES Website]</ref>.
==History==
==History==
The Wolverhampton facility was built to primarily service residual [[Household Waste]] from [[Wolverhampton City Council]] under a long term [[PPP]] contract and has been operational since 1998.
The Wolverhampton facility was built to primarily service residual [[Household Waste]] from [[Wolverhampton City Council]] under a long term [[PPP]] contract and has been operational since 1998.
==Plant==
==Plant==
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 7 tonnes per hour or up to 115,000 tonnes per annum and generating 8 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 7 tonnes per hour or up to 115,000 tonnes per annum and generating 8 MWe.
==Local Authority Users==
==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />