Millerhill Energy from Waste facility has been developed, constructed and is being operated through a 25-year partnership between [[FCC Environment]], the [[Edinburgh City Council]] and the [[Midlothian Council]]. The feedstock utilised at this plant is non-hazardous [[residual waste]], processing 135,000 tonnes per year of this material originating from households within the Edinburgh and Midlothian regions, and a remainder 20,000 tonnes per year originating from businesses. It is located at what used to be a brownfield site between the active railway yards operated by Network Rail and the former Monktonhall Colliery with good access to rail and road routes, enabling it to manage waste from both Edinburgh City and the Midlothian Councils<ref name="ref1" >Millerhill 2020. [https://millerhill.fccenvironment.co.uk/ Home – Millerhill. [online] Millerhill. [Accessed 4 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=58}}[[File:Millerhill EfW.jpg|400px|left|Millerhill EfW Jan 2019 (Millerhill, 2020)]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=PPC/A/1136072|id=58}}




Line 18: Line 17:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='PPC/A/1136072'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />