Earls Gate Energy Centre: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m page format and new link
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
{{#vardefine: epr|Tbc#24}}
{{#vardefine: epr|Tbc#24}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum, and will be a [[Combined Heat and Power]] facility, exporting 21.5 MW electricity and heat to the nearby chemical company [[CalaChem]] and to other adjacent industrial plants, with any excess power fed into the national grid. {{EfWTemplate|EPR={{#var: epr}}|id=148}}[[File:Earls Gate Energy Centre.jpg|400px|left|Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.]]
An [[EfW]] facility based upon conventional [[combustion]] technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum, and will be a [[Combined Heat and Power]] facility, exporting 21.5 MW electricity and heat to the nearby chemical company [[CalaChem]] and to other adjacent industrial plants, with any excess power fed into the national grid.  
<ref>Biothek Ecologic Fuel, 2018. [https://biothekecologic.com/energy-from-waste-chp-plant-to-power-scottish-industries/ Energy from waste CHP plant to power Scottish industries - Biothek Ecologic Fuel. Online. Biothek Ecologic Fuel. [Accessed 21 Feb. 2020].]</ref>__TOC__<br clear='left'/>
{{EfWTemplate|EPR={{#var: epr}}|id=148}}
[[File:Earls Gate Energy Centre.jpg|400px|left|Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.]]
<ref>Biothek Ecologic Fuel, 2018. [https://biothekecologic.com/energy-from-waste-chp-plant-to-power-scottish-industries/ Energy from waste CHP plant to power Scottish industries - Biothek Ecologic Fuel. Online. Biothek Ecologic Fuel. [Accessed 21 Feb. 2020].]</ref>__TOC__
<br clear='left'/>


==Summary==
==Summary==

Revision as of 11:55, 10 May 2021

An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum, and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid.

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.
Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.

[1]


Summary

An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum, and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid. The cost of the project is circa £200m, which was provided by the investors Brockwell Energy, the Green Investment Group and Covanta. The facility has been developed by Brockwell Energy, and will be operated by MES Environmental for a contract duration of 25 years. MES Environmental is now a subsidiary of Paprec, having agreed to buy out CNIM in March 2021[2].

The EfW will replace an existing gas-fired energy plant on the site.

It is expected for the facility to become operational by the end of 2021[3].

Technology

The moving-grate combustion technology will be provided by CNIM[4].

Construction

CNIM is the EPC contractor for this facility, with Clugston in charge of the civil engineering. Construction commenced in January 2019 and is scheduled to take 3 years, with commissioning ending and operations beginning in 2021[3].

Waste Input

The facility will accept residual waste as feedstock.

References