Haylers End Energy Recovery Plant: Difference between revisions
Arctellion (talk | contribs) No edit summary |
m minor text change |
||
Line 10: | Line 10: | ||
==Plant== | ==Plant== | ||
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[ | Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Incinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past. | ||