Haylers End Energy Recovery Plant: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 10: Line 10:


==Plant==
==Plant==
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Icinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past.
Commissioning is in an advanced stage. The technology provider is understood to be the same as the [[Scotia Business Park]] - supplied by [[Incinco]]<ref name="P3P1" /> with 1,000kg/hr capacity and with construction oversight by [[Cobalt Energy]]<ref>[https://www.cobaltenergy.co.uk/our-projects/malvern-clinical-waste-incineration/ Cobalt Energy News Item]</ref>. At 8,000 hrs annual operation the maximum annual throughput would be 8,000 tonnes per annum, although the plated capacity has been reported as 6,400 tonnes in the past.


==References==
==References==