Veterinary Laboratories Agency: Difference between revisions
add page specific text |
m minor text change |
||
Line 10: | Line 10: | ||
==Plant Description<ref name="Ref1" />== | ==Plant Description<ref name="Ref1" />== | ||
===Waste Reception & Storage=== | ===Waste Reception & Storage=== | ||
Waste is collected around the site in bins. These are transported to the incinerator where a bin lift loads the waste in to the incinerator by rotating the | Waste is collected around the site in bins. These are transported to the [[incinerator]] where a bin lift loads the waste in to the incinerator by rotating the bins 180 degrees, this ensures all the contents fall out of the bin in to the waste feed hopper. The waste is injected into the [[furnace]] by a ram. Once inside the [[combustion]] chamber, rams move the waste through the [[grate]] at approximately 900<sup>o</sup>C thus promoting continuous mixing of the waste with the [[combustion]] air introduced from beneath the [[grate]] into the heart of the fire. In the secondary chamber the gas temperature is maintained above 850<sup>o</sup>C for 2 seconds. [[IBA|Ash]] from the grate is discharged into a bespoke skip. | ||
===Energy Recovery=== | ===Energy Recovery=== | ||
Hot gases from the combustion of waste pass through a waste heat steam boiler. The temperature of the gases are reduced from over | Hot gases from the [[combustion]] of waste pass through a waste heat steam boiler. The temperature of the gases are reduced from over 850<sup>o</sup>C to around 160<sup>o</sup>C. The gases heat up the water in the boiler and produce steam at 4.5barG. This steam is fed to the site Energy Centre which distributes thermal energy around the site. | ||
===Gas Cleaning=== | ===Gas Cleaning=== | ||
Downstream of the boiler bicarbonate soda is injected to neutralise acid gases. Activated carbon is injected to adsorb any remaining dioxins, furans and heavy metals. Prior to release into the atmosphere the gases pass through a fabric filter where the air pollution control (APC) residues are removed from the gas stream; these are disposed of at a hazardous waste landfill. Once the gases have been cleaned they are discharged into the atmosphere via a stack. | Downstream of the boiler [[bicarbonate soda]] is injected to neutralise acid gases. [[Activated carbon]] is injected to adsorb any remaining [[dioxins]], [[furans]] and heavy metals. Prior to release into the atmosphere the gases pass through a fabric filter where the [[air pollution control]] ([[APC]]) residues are removed from the gas stream; these are disposed of at a [[hazardous waste landfill]]. Once the gases have been cleaned they are discharged into the atmosphere via a [[stack]]. | ||
==References== | ==References== |
Revision as of 08:10, 20 May 2021
The Animal Plant Heath Agency (APHA) operates on behalf of DEFRA Estates this Clinical Incinerator with a focus on hazardous clinical waste and animal waste. Only waste generated on site or at other DEFRA locations is incinerated on site via two machines[1].
Veterinary Laboratories Agency | |
See HT & Clin → page for a larger UK Wide map. | |
Waste Licence | AP3039SD |
Operator | DEFRA |
Operational Capacity | 3,614tpa |
Number of Lines | 2 |
Region | South East |
Annual Report Data
Year | Total In | Total Clinical | IBA Out | ACP Out | Op Hours
|
---|---|---|---|---|---|
2019 | 1048 | 646 | 90 | 65 | 2873 |
2018 | 1140 | 803 | 101 | 69 | 2007 |
2017 | 1254 | 840 | |||
2020 | 940 | 574 | 89 | 94 | 2873 |
2021 | 1063 | 664 | 99 | 68 | 3542 |
2022 | 957 | 670 | 97 | 76 | 3316 |
Summary
The Animal Plant Heath Agency (APHA) operates on behalf of DEFRA Estates this Clinical Incinerator with a focus on hazardous clinical waste and animal waste. Only waste generated on site or at other DEFRA locations is incinerated on site via two machines.
Plant Description[1]
Waste Reception & Storage
Waste is collected around the site in bins. These are transported to the incinerator where a bin lift loads the waste in to the incinerator by rotating the bins 180 degrees, this ensures all the contents fall out of the bin in to the waste feed hopper. The waste is injected into the furnace by a ram. Once inside the combustion chamber, rams move the waste through the grate at approximately 900oC thus promoting continuous mixing of the waste with the combustion air introduced from beneath the grate into the heart of the fire. In the secondary chamber the gas temperature is maintained above 850oC for 2 seconds. Ash from the grate is discharged into a bespoke skip.
Energy Recovery
Hot gases from the combustion of waste pass through a waste heat steam boiler. The temperature of the gases are reduced from over 850oC to around 160oC. The gases heat up the water in the boiler and produce steam at 4.5barG. This steam is fed to the site Energy Centre which distributes thermal energy around the site.
Gas Cleaning
Downstream of the boiler bicarbonate soda is injected to neutralise acid gases. Activated carbon is injected to adsorb any remaining dioxins, furans and heavy metals. Prior to release into the atmosphere the gases pass through a fabric filter where the air pollution control (APC) residues are removed from the gas stream; these are disposed of at a hazardous waste landfill. Once the gases have been cleaned they are discharged into the atmosphere via a stack.