Template:EfWLAData: Difference between revisions

From WikiWaste
m (minor text change)
No edit summary
Line 1: Line 1:
The following  represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
==Local Authority Data==
{{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}' |data=tot=sum(ton)}}{{#vardefine: total| {{#external_value:tot}}}}
The following  represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total [[Local Authority]] waste received by the plant in the period was: '''{{#if: {{#var:total}} | {{formatnum: {{#expr: {{#var:total}} round 2}} }}t | 0t }}'''
 
A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
{{#get_db_data: db=engy

Revision as of 05:16, 17 June 2021

Local Authority Data

The following represents those local authorities recorded as putting tonnage (either directly or via a transfer station) into the site on WasteDataFlow for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' below indicates no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage