Allington EFW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) |
||
| Line 19: | Line 19: | ||
The plant comprises 3 lines with a design capacity capable of 21.4 tonnes/hour each equivalent to around 526,000 tonnes per annum via standard combustion technology. It uses fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] which is pre-processed to meet the needs of the technology (the technology being capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref> in a range of applications). | The plant comprises 3 lines with a design capacity capable of 21.4 tonnes/hour each equivalent to around 526,000 tonnes per annum via standard combustion technology. It uses fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] which is pre-processed to meet the needs of the technology (the technology being capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref> in a range of applications). | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||