Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]]. | Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]]. | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||