Environmental Permitting (England and Wales) Regulations 2016: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Addition of new table
Northern Chick (talk | contribs)
Insertion of table and links
Line 12: Line 12:
! Policy Area !! EPR Schedule
! Policy Area !! EPR Schedule
|-
|-
| Chapter II Industrial Emissions Directive (Integrated Pollution Prevention and Control) || 7 – Part A installations
| Chapter II [[Industrial Emissions Directive]] ([[IPPC Directive|Integrated Pollution Prevention and Control]]) || 7 – Part A installations
|-
|-
| Part B installations and Part B mobile plant || 8 – Part B installations and Part B mobile plant
| Part B installations and Part B mobile plant || 8 – Part B installations and Part B mobile plant
|-
|-
| Waste Framework Directive || 9 – Waste operations and materials facilities
| [[Waste Framework Directive]] || 9 – Waste operations and materials facilities
|-
|-
| Landfill Directive || 10 - Landfill
| [[Landfill Directive]] || 10 - [[Landfill]]
|-
|-
| End-of-life Vehicles Directive || 11 – Waste motor vehicles
| [[End-of-Life Vehicles]] Directive || 11 – Waste motor vehicles
|-
|-
| Waste Electrical and Electronic Equipment Directive || 12 – Waste electrical and electronic equipment
| [[WEEE Directive|Waste Electrical and Electronic Equipment Directive]] || 12 – [[Waste Electrical and Electronic Equipment]]
|-
|-
| Chapter IV Industrial Emissions Directive || 13 – Waste incineration
| Chapter IV [[Industrial Emissions Directive]] || 13 – [[Waste]] [[Incineration]]
|-
|-
| Chapter V Industrial Emissions Directive || 14 – Solvent emission activities
| Chapter V [[Industrial Emissions Directive]] || 14 – Solvent emission activities
|-
|-
| Chapter III Industrial Emissions Directive || 15 – Large combustion plants
| Chapter III [[Industrial Emissions Directive]] || 15 – Large Combustion plants
|-
|-
| Asbestos Directive || 16 – Asbestos
| Asbestos Directive || 16 – Asbestos
|-
|-
| Example || Example
|Chapter VI [[Industrial Emissions Directive]]  || 17 – Titanium dioxide
|-
|-
| Example || Example
| Petrol Vapour Recovery Directive|| 18 – Petrol vapour recovery
|-
|-
| Example || Example
| [[Batteries]] Directive || 19 – Waste batteries and accumulators
|-
|-
| Example || Example
| [[Mining Waste]] Directive || 20 – [[Mining Waste]] operations
|-
|-
| Example || Example
| Water discharge activities || 21 – Water discharge activities
|-
|-
| Example || Example
| Groundwater activities || 22 – Groundwater activities
|-
|-
| Example || Example
| Basic Safety Standards Directive || 23 – Radioactive substances activities
|-
|-
| Example || Example
| Energy Efficiency Directive || 24 – Efficiency in heating and cooling energy
|-
|-
| Example || Example
| Flood risk activities and excluded flood risk activities || 25 – Flood risk activities and excluded flood risk activities
|-
|-
| Example || Example
| Medium Combustion Plant Directive || Medium combustion plants
|-
|-
| Example || Example
| Specified generators || 25B - Specified generators
|-
| Example || Example
|}
|}



Revision as of 13:16, 18 August 2021


The Environmental Permitting (England and Wales) Regulations 2016 S.I. No. 1154 ("the 2016 Regulations") consolidate and replace the Environmental Permitting (England and Wales) Regulations 2010 S.I. No. 675 which had been amended 15 times. The 2016 Regulations set out an Environmental Permitting and compliance regime that applies to various activities and industries[1].

As well as consolidating and updating the legislation, there is also a set of amendments to the 2016 Regulations which revise the rules for mobile crushing of lamps that contain mercury (the T17 exemption)[1]. This restricts those who are able to crush lamps under the T17 and reduce the number of lamps which can be crushed without a permit[1].

The Environmental Permitting (England and Wales) Regulations 2016 has also been used to transpose many EU Directives into domestic law. Each Directive or policy area covered by the Environmental Permitting Regulations (EPR) regime has a speciifc schedule[2].

Policy Area EPR Schedule
Chapter II Industrial Emissions Directive (Integrated Pollution Prevention and Control) 7 – Part A installations
Part B installations and Part B mobile plant 8 – Part B installations and Part B mobile plant
Waste Framework Directive 9 – Waste operations and materials facilities
Landfill Directive 10 - Landfill
End-of-Life Vehicles Directive 11 – Waste motor vehicles
Waste Electrical and Electronic Equipment Directive 12 – Waste Electrical and Electronic Equipment
Chapter IV Industrial Emissions Directive 13 – Waste Incineration
Chapter V Industrial Emissions Directive 14 – Solvent emission activities
Chapter III Industrial Emissions Directive 15 – Large Combustion plants
Asbestos Directive 16 – Asbestos
Chapter VI Industrial Emissions Directive 17 – Titanium dioxide
Petrol Vapour Recovery Directive 18 – Petrol vapour recovery
Batteries Directive 19 – Waste batteries and accumulators
Mining Waste Directive 20 – Mining Waste operations
Water discharge activities 21 – Water discharge activities
Groundwater activities 22 – Groundwater activities
Basic Safety Standards Directive 23 – Radioactive substances activities
Energy Efficiency Directive 24 – Efficiency in heating and cooling energy
Flood risk activities and excluded flood risk activities 25 – Flood risk activities and excluded flood risk activities
Medium Combustion Plant Directive Medium combustion plants
Specified generators 25B - Specified generators


References