Binn Eco Park EFW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|Tbc09}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum. | An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum. | ||