Slough Multifuel EFW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|Tbc08}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology and presently in early stage construction. [[Slough Multifuel EFW]] was granted [[Planning Permission|planning permission]] in 2017 and has a permitted capacity of 480,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=75}}[[File:Slough-mf.png|350px|left|Slough Multifuel rendered image from SSE Thermal website, all rights reserved]]__TOC__<br clear='left'/> | An [[EfW]] facility based upon conventional [[combustion]] technology and presently in early stage construction. [[Slough Multifuel EFW]] was granted [[Planning Permission|planning permission]] in 2017 and has a permitted capacity of 480,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=75}}[[File:Slough-mf.png|350px|left|Slough Multifuel rendered image from SSE Thermal website, all rights reserved]]__TOC__<br clear='left'/> | ||
Revision as of 08:09, 19 August 2021
An EfW facility based upon conventional combustion technology and presently in early stage construction. Slough Multifuel EFW was granted planning permission in 2017 and has a permitted capacity of 480,000 tonnes per annum.
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology and presently in early stage construction. Slough Multifuel EFW was granted planning permission in 2017 and has a permitted capacity of 480,000 tonnes per annum. The site was purchased in 2008 by SSE and the project is being developed by a 50:50 joint venture between SEE Thermal and Copenhagen Infrastructure Partners (CIP)[1].
The plant is located on the Slough Trading Estate, close to the Slough Heat & Power facility, which is based on biomass feedstock.
Technology
The plant technology will comprise standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating 50MWe [2].
Construction
The plant gained planning permission in 2017, and will delivered by an EPC turnkey arrangement with Hitachi Zosen Inova technology. Construction is reported to commence in 2021 with a three and a half year construction programme for operational handover in Q4 2024..
Waste Input
The plant is intended to run on waste derived fuel from residual Household Waste and Commercial Waste, with around two thirds identified for long term contract.