Environmental Permit: Difference between revisions
m →Exemptions: insertion of references |
|||
| Line 15: | Line 15: | ||
==Bespoke Permit== | ==Bespoke Permit== | ||
Bespoke permits are site specific permits tailored to the activity undertaken at the site. These permits do not fit the criteria or design parameters for standard rules permits. All [[landfill]] permits are bespoke permits as are all Part A (1) activities which fall within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations | Bespoke permits are site specific permits tailored to the activity undertaken at the site. These permits do not fit the criteria or design parameters for standard rules permits. All [[landfill]] permits are bespoke permits as are all Part A (1) activities which fall within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations 2016]]. | ||
A bespoke permit can also be applied for the use of the deposit of waste for recovery. | A bespoke permit can also be applied for the use of the deposit of waste for recovery. | ||