Lostock Sustainable Energy Plant: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m news update and link
Line 3: Line 3:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by joint venture company [[Lostock Sustainable Energy Plant Ltd]] - an arrangement between [[Copenhagen Infrastructure Partners]] (60%) and [[FCC Environment]] (40%) with the original developer [[Tata Steel]] 'remaining a participant'.
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by joint venture company [[Lostock Sustainable Energy Plant Ltd]] - an arrangement between [[Copenhagen Infrastructure Partners]] (60%) and [[FCC Environment]] (40%) with the original developer [[Tata Steel]] 'remaining a participant'. It was reported in November 2021 that the facility had applied to [[BEIS]] for an additional 128,000 tonnes per annum (taking the capacity to 728,000 tonnes per annum) without changing any of the buildings or approved infrastructure<ref>[https://www.mrw.co.uk/news/cheshire-efw-seeks-extra-capacity-05-11-2021/ MRW Artile]</ref>


==Technology==
==Technology==