Template:EfWLAData: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
{{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}'|limit=1 |data=updated=updated}}{{#vardefine: updated|{{#external_value:updated}}}} | {{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}'|limit=1 |data=updated=updated}}{{#vardefine: updated|{{#external_value:updated}}}} | ||
{{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}' |data=tot=sum(ton)}}{{#vardefine: total| {{#external_value:tot}}}} | {{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}' |data=tot=sum(ton)}}{{#vardefine: total| {{#external_value:tot}}}} | ||
The following represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Waste Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] {{#iferror: {{#var:update}}| for the financial year | The following represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Waste Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] {{#iferror: {{#var:update}}| for the financial year 2020/21 and for Scotland for the calendar year 2020 | for the most recent financial year, data was updated on {{#var:updated}}}}. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total [[Local Authority]] waste received by the plant in the period was: '''{{#if: {{#var:total}} | {{formatnum: {{#expr: {{#var:total}} round 2}} }}t | 0t }}''' | ||
A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. |
Revision as of 13:02, 20 January 2022
Local Authority Data
The following represents those local authorities recorded as putting tonnage (either directly or via a transfer station) into the site on WasteDataFlow for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t
A 'zero return' below indicates no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|