Newport Alexandra Docks: Difference between revisions
Arctellion (talk | contribs) No edit summary |
m add new link |
||
| Line 10: | Line 10: | ||
==Construction== | ==Construction== | ||
Construction of this facility started early in 2020 and is scheduled to become operational in 2023<ref name="ref1" />. | Construction of this facility started early in 2020 and is scheduled to become operational in 2023<ref name="ref1" />. The operational contracted has been reported as being with [[Harris Pye]], part of the [[Joulon Group]]<ref>[https://www.letsrecycle.com/news/newport-efw-plant-12-months-from-operations/ Letsrecyle.com article January 2022]</ref>. | ||
==Waste Input== | ==Waste Input== | ||