Hazardous Landfill: Difference between revisions
No edit summary |
|||
Line 7: | Line 7: | ||
==Capacity Hazardous Landfill== | ==Capacity Hazardous Landfill== | ||
The capacity of Hazardous Landfill is reported<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref> by the EA for England and is summarised in the graph and table below. Capacity for Hazardous Waste is split out into 'Restricted Sites' by the [[EA]] which totaled 722,708 cubic meters in 2015 and 832,407 cubic metres in 2019, dropping to 809,640 cubic metres in 2020. Note that Hazardous Landfill also provides [[Inert Landfill]] capacity in the sense that these waste are used for daily cover and site engineering purposes. | The capacity of [[Hazardous Landfill]] is reported<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref> by the EA for England and is summarised in the graph and table below. Capacity for Hazardous Waste is split out into 'Restricted Sites' by the [[EA]] which totaled 722,708 cubic meters in 2015 and 832,407 cubic metres in 2019, dropping to 809,640 cubic metres in 2020. Note that [[Hazardous Landfill]] also provides [[Inert Landfill]] capacity in the sense that these waste are used for daily cover and site engineering purposes. | ||
The number of Hazardous Restricted Landfill (ref. L06) sites in England in 2020 was 5, with no change on 2019. The number of Hazardous Merchant Landfill Sites (ref. L01) and summarised in the graph and table below totaled 12, a drop of 1 since 2019. | The number of 'Hazardous Restricted Landfill' (ref. L06) sites in England in 2020 was 5, with no change on 2019. The number of 'Hazardous Merchant Landfill Sites' (ref. L01) and summarised in the graph and table below totaled 12, a drop of 1 since 2019. | ||
{|style="margin: auto;" | {|style="margin: auto;" | ||
Line 83: | Line 83: | ||
==Capacity Non-Hazardous Landfill with Stabilised Non-Reactive Hazardous Waste== | ==Capacity Non-Hazardous Landfill with Stabilised Non-Reactive Hazardous Waste== | ||
The capacity of [[Non-Hazardous Landfill]] which has a cell or cells for [[Stabilised Non-Reactive Hazardous Waste]] is also reported by the EA and is summarised in the graph and table below (although the proportion of the total which is Stabilised Non-Reactive Hazardous Waste is generally relatively small). Note that Hazardous Landfill also provides Inert Landfill capacity in the sense that these waste are used for daily cover and site engineering purposes. | The capacity of [[Non-Hazardous Landfill]] which has a cell or cells for [[Stabilised Non-Reactive Hazardous Waste]] is also reported by the EA and is summarised in the graph and table below (although the proportion of the total which is Stabilised Non-Reactive Hazardous Waste is generally relatively small). Note that Hazardous Landfill also provides Inert Landfill capacity in the sense that these waste are used for daily cover and site engineering purposes. | ||
The number of [[Non-Hazardous Landfill]] with a [[Stabilised Non-Reactive Hazardous Waste|SNRHW]] cell (ref. L02) sites in England in 2020 was 30, an increase of 1 on 2019. | |||
{|style="margin: auto;" | {|style="margin: auto;" |
Revision as of 15:01, 1 March 2022
Only a Hazardous Landfill can accept Hazardous Waste for Landfill Disposal but only then if it meets the relevant standards for engineering and management controls and Waste Acceptance Criteria set out in the Annex to the EU Decision (2003/33/EC)[1], but it may also be able to accept small quantities of Inert Waste. Hazardous landfill sites cannot accept Non-Hazardous Waste. There are some restricted circumstances in which Non-hazardous Landfill can accept Hazardous Waste, these are described further below.
There are numerical limit values for leachable inorganic substances, organic content along with standards for physical stability. These exist for both granular and monolithic hazardous waste.
Standards require Hazardous Waste that is disposed of with other Non-Hazardous Waste to be in separate engineered cells within the Landfill where Stabilised Non-Reactive Hazardous Waste or Gypsum Waste (normally plasterboard) is to be disposed of[2].
Capacity Hazardous Landfill
The capacity of Hazardous Landfill is reported[3] by the EA for England and is summarised in the graph and table below. Capacity for Hazardous Waste is split out into 'Restricted Sites' by the EA which totaled 722,708 cubic meters in 2015 and 832,407 cubic metres in 2019, dropping to 809,640 cubic metres in 2020. Note that Hazardous Landfill also provides Inert Landfill capacity in the sense that these waste are used for daily cover and site engineering purposes.
The number of 'Hazardous Restricted Landfill' (ref. L06) sites in England in 2020 was 5, with no change on 2019. The number of 'Hazardous Merchant Landfill Sites' (ref. L01) and summarised in the graph and table below totaled 12, a drop of 1 since 2019.
<graph>{
"width":400, "height":200, "data":[{ "name":"table", "values":[ {"x":2015,"y":17.7},{"x":2016,"y":19.3},{"x":2017,"y":18.8}, {"x":2018,"y":19.1},{"x":2019,"y":18.4},{"x":2020,"y":15.6} ] }], "scales": [ { "name": "x", "type": "linear", "range": "width", "zero": false, "domain": {"data": "table", "field": "x"} }, { "name": "y", "type": "linear", "range": "height", "nice": true, "domain": {"data": "table", "field": "y"} } ], "axes": [ {"type": "x", "scale": "x", "format":"d","title":"Year"}, {"type": "y", "scale": "y", "grid":true, "title":"Million Cubic Metres"} ], "marks": [ { "type": "line", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale": "x", "field": "x"}, "y": {"scale": "y", "field": "y"}, "stroke": {"value": "steelblue"}, "strokeWidth":{"value":2} } } }, { "type": "symbol", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale":"x","field": "x"}, "y": {"scale":"y","field": "y"}, "fill": {"value": "steelblue"}, "size":{"value":15} } } } ] }</graph> |
Year | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 |
Million Cubic Metres | 17.7 | 19.3 | 18.8 | 19.1 | 18.4 | 15.6 |
Capacity Non-Hazardous Landfill with Stabilised Non-Reactive Hazardous Waste
The capacity of Non-Hazardous Landfill which has a cell or cells for Stabilised Non-Reactive Hazardous Waste is also reported by the EA and is summarised in the graph and table below (although the proportion of the total which is Stabilised Non-Reactive Hazardous Waste is generally relatively small). Note that Hazardous Landfill also provides Inert Landfill capacity in the sense that these waste are used for daily cover and site engineering purposes.
The number of Non-Hazardous Landfill with a SNRHW cell (ref. L02) sites in England in 2020 was 30, an increase of 1 on 2019.
<graph>{
"width":400, "height":200, "data":[{ "name":"table", "values":[ {"x":2015,"y":89.4},{"x":2016,"y":85.3},{"x":2017,"y":82.9}, {"x":2018,"y":75.1},{"x":2019,"y":69.4},{"x":2020,"y":67.0} ] }], "scales": [ { "name": "x", "type": "linear", "range": "width", "zero": false, "domain": {"data": "table", "field": "x"} }, { "name": "y", "type": "linear", "range": "height", "nice": true, "domain": {"data": "table", "field": "y"} } ], "axes": [ {"type": "x", "scale": "x", "format":"d","title":"Year"}, {"type": "y", "scale": "y", "grid":true, "title":"Million Cubic Metres"} ], "marks": [ { "type": "line", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale": "x", "field": "x"}, "y": {"scale": "y", "field": "y"}, "stroke": {"value": "steelblue"}, "strokeWidth":{"value":2} } } }, { "type": "symbol", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale":"x","field": "x"}, "y": {"scale":"y","field": "y"}, "fill": {"value": "steelblue"}, "size":{"value":15} } } } ] }</graph> |
Year | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 |
Million Cubic Metres | 89.4 | 85.3 | 82.9 | 75.1 | 69.4 | 67.0 |
References
- ↑ EU Council Decision (2003/33/EC) establishing criteria and procedures for the acceptance of waste at landfills pursuant to Art 16 of and Annex II to Directive 1999/31/EC
- ↑ Defra, 2010. Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs, p.7.
- ↑ EA Remaining Landfill Capacity