Beddington Farmlands Landfill Site: Difference between revisions

Howard (talk | contribs)
Bin52 (talk | contribs)
m change template
 
Line 33: Line 33:
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste [[MRF]], an [[In-vessel Composting]] ([[IVC]]) facility and [[Beddington EfW]], which will eventually take over for the landfill when it closes. Several of these facilities are associated with contracts with the [[South London Waste Partnership]].
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste [[MRF]], an [[In-vessel Composting]] ([[IVC]]) facility and [[Beddington EfW]], which will eventually take over for the landfill when it closes. Several of these facilities are associated with contracts with the [[South London Waste Partnership]].


==Tonnage Handled==
Only Waste Codes receiving over 5,000t are shown.
{{NHLFTable|Permit=VP3039SW}}
{{NHLFTable|Permit=VP3039SW}}


==References==
==References==
<references />
<references />