Beddington Farmlands Landfill Site: Difference between revisions
m change template |
|||
| Line 33: | Line 33: | ||
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste [[MRF]], an [[In-vessel Composting]] ([[IVC]]) facility and [[Beddington EfW]], which will eventually take over for the landfill when it closes. Several of these facilities are associated with contracts with the [[South London Waste Partnership]]. | Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste [[MRF]], an [[In-vessel Composting]] ([[IVC]]) facility and [[Beddington EfW]], which will eventually take over for the landfill when it closes. Several of these facilities are associated with contracts with the [[South London Waste Partnership]]. | ||
{{NHLFTable|Permit=VP3039SW}} | {{NHLFTable|Permit=VP3039SW}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||