South Ferriby Cement Kiln: Difference between revisions
No edit summary |
|||
| Line 22: | Line 22: | ||
==Waste Used on Site== | ==Waste Used on Site== | ||
The South Ferriby site waste return to the [[EA]] for the most recent year showed the following wastes used on site, primarily for the primary purpose of substituting fuel requirements in the plant: | The South Ferriby site waste return to the [[EA]] for the most recent year showed the following wastes used on site, primarily for the primary purpose of substituting fuel requirements in the plant: | ||
{{ | {{EAIn|EPR=BL1029IP}} | ||
{{NHLFTable|Permit=BL1029IP}} | |||
The proportion of the [[RDF]]/[[SRF]] tonnage used by [[Cemex]] is referred to by the company as [[Climafuel]]. | The proportion of the [[RDF]]/[[SRF]] tonnage used by [[Cemex]] is referred to by the company as [[Climafuel]]. | ||
==References== | ==References== | ||
<references /> | <references /> | ||