Markley Group Biomass: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc4}} | ||
{{BiomassPlant|NAME=Markley Group Biomass|id=57}} | {{BiomassPlant|NAME=Markley Group Biomass|id=57|EPR={{#var: epr}}}} | ||
[[File:Premiere Kitchens Biomass Facility.jpg|300px|left|Premiere Kitchens Biomass Facility]]__TOC__ | [[File:Premiere Kitchens Biomass Facility.jpg|300px|left|Premiere Kitchens Biomass Facility]]__TOC__ | ||
<br clear="left"/> | <br clear="left"/> |
Revision as of 15:50, 1 August 2022
Markley Group Biomass Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Markley Group (Premiere Kitchens) |
Capacity | 2.1 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | |
ROC | No |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass EFW located at Markley Group premises in Hardwicke, Gloucestershire, which generates 2.1MW from c. 2,300 tonnes of Wood Waste from its commercial business[1].
In 2012, Gloucester based Markley Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markley Group, Premiere Kitchens[1]. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Hardwicke[1].
Following the installation of the biomass facility, Markley Group were able to remove its mains gas supply and as a result the company reduces its carbon emissions by more than c.1,200 tonnes per year[1].
Plant
The plant was commissioned by UK-based Indusvent Limited who were instructed to design, supply and install a complete turnkey project which included a dust extraction and filtration system for production machinery, a sealed chipboard dust and chips transportation system, a 300m3 storage silo with hydraulic moving floor discharge, shredding of off-cuts and burning of the collected material to provide hot water and heating for both the office and factory heating[2]. The system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S[1]. The burning of the Wood Waste in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark[1].
Tonnage Input/Fuel
The tonnage received by the plant is a mixture of Wood Waste off-cuts from its kitchen construction business and is essentially 'internal' material that is neither reported in the most recent Annual Sustainability Report for 2018-19[3] by Ofgem or the EA data for the calendar year (i.e. January 2018 to December 2018).