Parc Adfer EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
Line 1: Line 1:
{{#vardefine:epr|Tbc03}}[[Category:EfW Plants]]
{{#vardefine:epr|AB3092CV}}[[Category:EfW Plants]]
The Parc Adfer Energy from Waste facility was developed by and is operated by [[Wheelabrator]], located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a [[CHP]] plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the [[North Wales Residual Waste Treatment Project]]<ref name= "ref1"> Wheelabrator, 2020. [https://wtiparcadfer.co.uk/about-us/ About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=55}}[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]__TOC__<br clear='left' />
The Parc Adfer Energy from Waste facility was developed by and is operated by [[Wheelabrator]], located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a [[CHP]] plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the [[North Wales Residual Waste Treatment Project]]<ref name= "ref1"> Wheelabrator, 2020. [https://wtiparcadfer.co.uk/about-us/ About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=55}}[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]__TOC__<br clear='left' />