Skip Lorry: Difference between revisions
add page specific text |
No edit summary |
||
| Line 14: | Line 14: | ||
During tipping the sheeting system is rolled back (if used), and the retaining hooks at the rear of the skip are left locked in place and the legs are extended to provide stability. The lifting arm then pushes the skip upwards at the front to facilitate the material in the skip sliding out as it pivots on the retaining hooks and bar. | During tipping the sheeting system is rolled back (if used), and the retaining hooks at the rear of the skip are left locked in place and the legs are extended to provide stability. The lifting arm then pushes the skip upwards at the front to facilitate the material in the skip sliding out as it pivots on the retaining hooks and bar. | ||
[[File:Skip-loader-gallery01.jpg|450px|left|Skip Lorry with skip in process of being loaded on the lorry, all rights reserved Tata Motors]]<br clear='left'/> | {| class="wikitable" | ||
|- | |||
| [[File:Skip-loader-gallery01.jpg|450px|left|Skip Lorry with skip in process of being loaded on the lorry, all rights reserved Tata Motors]] ||{{#ev:youtube|v=ymcks9L_myE|450|inline| | |start=7&end=76}} | |||
|- | |||
|'''Skip Lorry Loading by Tata Motors'''||'''Video Footage of Skip lOading and Unloading by EFR Wakefield Skips''' | |||
|} | |||
<br clear='left'/> | |||