Templeborough Biomass Power Plant: Difference between revisions
add page specific text |
m Bin52 moved page Templeborough Biomass Power Plant Ltd to Templeborough Biomass Power Plant: updated database |
(No difference)
|
Revision as of 12:17, 9 August 2022
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2018 | 67486 | 0 | 0 | 0 | 67486 |
2019 | 207916 | 0 | 0 | 0 | 207916 |
2020 | 240778 | 0 | 0 | 0 | 240778 |
2021 | 297951 | 0 | 0 | 0 | 297951 |
2022 | 251678 | 0 | 0 | 0 | 251678 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2018 | 4241 | 6.28% | 1100 | 1.63% |
2019 | 58449 | 28.11% | 15005 | 7.22% |
2020 | 11657 | 4.84% | 4050 | 1.68% |
2021 | 21747 | 7.30% | 6143 | 2.06% |
2022 | 19928 | 7.92% | 6486 | 2.58% |