Plymouth Timber Resource Recovery Plant: Difference between revisions
mNo edit summary |
m Bin52 moved page Dartmoor to Plymouth Timber Resource Recovery Plant: updated database |
(No difference)
|
Revision as of 16:50, 9 August 2022
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass EfW facility based on up to 36,000 tonnes per annum of Wood Waste producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the Wood Waste feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business[2].
The facility was developed by CoGen who continues to provide management services[2].
Until 2019, the facilities operator was Zebec.
Plant
The facility utilises Nexterra’s gasification system technology, which is an Advanced Conversion Technology[2].
Tonnage Input/Fuel
There is no tonnage reported as received by the plant in the most recent Annual Sustainability Report for 2018-19[3].
The Wood Waste tonnage received in the EA statistics on a calendar year basis (i.e. January 2018 to December 2018) was 10,556 tonnes.
References
- ↑ Dartmoor Bio Power Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 2.2 CoGen, 2018. Projects — Cogen. Online. CoGen. [Accessed 3 April 2020.
- ↑ Biomass Sustainability Dataset 2018-19