Caledonian CHP: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add templates and image
Bin52 (talk | contribs)
add page specific text
 
Line 1: Line 1:
A biomass boiler designed to run on both Waste Wood and Virgin Wood, the 28Mwe [[Caledonian CHP]] facility was commissioned in 2009 and supplies over half of the power required and 100% of the steam required by [[UPM]]'s Caledonian Paper Mill in Irivine, Scotland<ref>https://www.upmpaper.com/about-us/our-locations/our-paper-mills/upm-caledonian-paper/</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|PPC/W/0020002}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|PPC/W/0020002}}
{{BiomassPlant|NAME=Caledonian CHP|id=51|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Caledonian CHP|id=19|EPR={{#var: epr}}}}
[[File:928379660 Biomass-Plant 2560px.jpg|300px|left|EPCM delivery for Caledonian Biomass CHP Plant, UK , all rights reserved AFRY]]__TOC__
[[File:928379660 Biomass-Plant 2560px.jpg|300px|left|EPCM delivery for Caledonian Biomass CHP Plant, UK , all rights reserved AFRY]]__TOC__
<br clear='left'/>
<br clear='left'/>


==Summary==
==Summary==
to add
A biomass boiler designed to run on both Waste Wood and Virgin Wood, the 28Mwe [[Caledonian CHP]] facility was commissioned in 2009 and supplies over half of the power required and 100% of the steam required by [[UPM]]'s Caledonian Paper Mill in Irivine, Scotland.


==Plant==
==Plant==
to add
A bubbling [[Fluidised Bed]] design supplied by [[Valmet]] with feasibility, [[EPC]] and engineering services for [[EPCM]] supplied by [[AFRY]]<ref>https://afry.com/en/project/epcm-delivery-caledonian-biomass-chp-plant-uk</ref>


{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}

Latest revision as of 13:30, 22 August 2022

A biomass boiler designed to run on both Waste Wood and Virgin Wood, the 28Mwe Caledonian CHP facility was commissioned in 2009 and supplies over half of the power required and 100% of the steam required by UPM's Caledonian Paper Mill in Irivine, Scotland[1].


Caledonian CHP
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator UPM-Kymmene (UK) Ltd
Capacity 28 MWe
Feedstock Virgin
EPR (Waste Licence) PPC/W/0020002
ROC Yes
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2022 0 0 0 85423 301006


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

EPCM delivery for Caledonian Biomass CHP Plant, UK , all rights reserved AFRY
EPCM delivery for Caledonian Biomass CHP Plant, UK , all rights reserved AFRY


Summary

A biomass boiler designed to run on both Waste Wood and Virgin Wood, the 28Mwe Caledonian CHP facility was commissioned in 2009 and supplies over half of the power required and 100% of the steam required by UPM's Caledonian Paper Mill in Irivine, Scotland.

Plant

A bubbling Fluidised Bed design supplied by Valmet with feasibility, EPC and engineering services for EPCM supplied by AFRY[2]

Annual Sustainability Tonnage Input/Fuel

The tonnage[3] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[4]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 64545 0 0 8048 67457 35873 125441 0 0 26091
2019/20 0 67309 0 0 13103 42988 28426 99385 0 0 28111
2018/19 0 70195 0 0 17995 49614 24079 86780 0 0 34748
2017/18 0 0 0 0 0 0 0 0 0 0 0

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit PPC/W/0020002, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References