Sleaford REP: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Sleaford REP]] (Renewable Energy Plant) in Lincolnshire has been in operation since September 2014, generating 38MW from primarily baled straw and some limited [[Wood Waste]]<ref>http://www.sleafordrep.co.uk/</ref>. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|DP3030XH}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|DP3030XH}} | ||
{{BiomassPlant|NAME=Sleaford REP|id=70|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Sleaford REP|id=70|EPR={{#var: epr}}}} | ||
Line 5: | Line 6: | ||
==Summary== | ==Summary== | ||
[[Sleaford REP]] (Renewable Energy Plant) in Lincolnshire has been in operation since September 2014, generating 38MW from primarily straw and some limited [[Wood Waste]]. It is owned by [[Greencoat Capital]], with management and fuel supply by [[Eco2]], with [[BWSC]] responsible for operations and maintenance<ref>http://www.sleafordrep.co.uk/?page_id=817</ref>. | |||
==Plant== | ==Plant== | ||
to | The plant was built by [[BWSC]] and is also operated by them on a 14 year contract from 2014. It is designed to use around 240,000 tonnes per annum of baled straw via a vibratig [[grate]] and steam generated in a [[BWE]] [[boiler]]<ref>https://www.bwsc.com/Files/Files/PDF/Project%20brochures/Turnkey%20contractor/Europe/BWSC_Europe_UK_Sleaford_30-0262.pdf</ref>. | ||
{{BioSustain|EPR={{#var: epr}}}} | {{BioSustain|EPR={{#var: epr}}}} |
Latest revision as of 14:48, 22 August 2022
Sleaford REP (Renewable Energy Plant) in Lincolnshire has been in operation since September 2014, generating 38MW from primarily baled straw and some limited Wood Waste[1].
Sleaford REP Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Burmeister & Wain Scandinavian Contractor (BWSC) |
Capacity | 38 MWe |
Feedstock | Straw/Virgin |
EPR (Waste Licence) | DP3030XH |
ROC | Yes |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
Sleaford REP (Renewable Energy Plant) in Lincolnshire has been in operation since September 2014, generating 38MW from primarily straw and some limited Wood Waste. It is owned by Greencoat Capital, with management and fuel supply by Eco2, with BWSC responsible for operations and maintenance[2].
Plant
The plant was built by BWSC and is also operated by them on a 14 year contract from 2014. It is designed to use around 240,000 tonnes per annum of baled straw via a vibratig grate and steam generated in a BWE boiler[3].
Annual Sustainability Tonnage Input/Fuel
The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:
Year | Waste Wood (m3) | Waste Wood (t) | Straw | Miscanthus | Arboricultrual Waste | Sawmill Residue | Foresrty Residue | Round Wood | Short Rotation Coppice | MBM | Other Material |
---|---|---|---|---|---|---|---|---|---|---|---|
2020/21 | 0 | 32 | 155475 | 0 | 0 | 0 | 0 | 9971 | 712 | 0 | 0 |
2019/20 | 0 | 1684 | 225703 | 0 | 0 | 0 | 0 | 1949 | 0 | 0 | 0 |
2018/19 | 0 | 14032 | 146220 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2017/18 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='DP3030XH' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='DP3030XH' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit DP3030XH, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ http://www.sleafordrep.co.uk/
- ↑ http://www.sleafordrep.co.uk/?page_id=817
- ↑ https://www.bwsc.com/Files/Files/PDF/Project%20brochures/Turnkey%20contractor/Europe/BWSC_Europe_UK_Sleaford_30-0262.pdf
- ↑ In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
- ↑ Biomass Sustainability Dataset 2020-21