Thameside Energy Recovery Facility: Difference between revisions

Bin52 (talk | contribs)
add page specific text
 
Bin52 (talk | contribs)
No edit summary
Line 1: Line 1:
{{#vardefine:epr|Tbc36}}[[Category:EfW Plants]]
{{#vardefine:epr|Tbc36}}[[Category:EfW Plants]]


[[Tilbury Docks - Phase 2 (EfW)]] is an [[EfW]] facility based upon conventional [[combustion]] technology that is the second phase of a development also comprised [[Biomass Waste EFW]] facility listed on WikiWaste as [[Tilbury Green Power]]. This second phase of the site is anticipated to process 350,000 tonnes per annum of [[residual waste]].   
[[Tilbury Docks - Phase 2 (EfW)]] is an [[EfW]] facility based upon conventional [[combustion]] technology that is the second phase of a development that also comprises a [[Biomass Waste EFW]] facility - listed on WikiWaste as [[Tilbury Green Power]]. This second phase of the site is anticipated to process 350,000 tonnes per annum of [[residual waste]].   


{{EfWTemplate|EPR={{#var:epr}}|id=139}}
{{EfWTemplate|EPR={{#var:epr}}|id=139}}