Ribblesdale Cement Kiln: Difference between revisions
mNo edit summary |
No edit summary |
||
Line 19: | Line 19: | ||
The primary raw materials are Carboniferous Limestone from the adjacent quarry, using interlaced shale on the same site and superficial clay. | The primary raw materials are Carboniferous Limestone from the adjacent quarry, using interlaced shale on the same site and superficial clay. | ||
{{NHLFTable|Permit=BL7272IB}} | {{NHLFTable|Permit=BL7272IB}} | ||
{{EAIn|EPR=BL7272IB}} | {{EAIn|EPR=BL7272IB|CK=T}} | ||
Just under 40% of the tonnage listed is used for the primary purpose of substituting fuel requirements in the plant, with 55% of coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used as a replacement for raw material in the production process. The most recent annual performance report from 2016 did not report the exact tonnage used - quoting commercial confidentiality<ref>[https://www.hanson-communities.co.uk/en/search?keywords=ribblesdale Link to pdf via Hanson Website - 2016 Annual Performance report 2016]</ref>. | Just under 40% of the tonnage listed is used for the primary purpose of substituting fuel requirements in the plant, with 55% of coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used as a replacement for raw material in the production process. The most recent annual performance report from 2016 did not report the exact tonnage used - quoting commercial confidentiality<ref>[https://www.hanson-communities.co.uk/en/search?keywords=ribblesdale Link to pdf via Hanson Website - 2016 Annual Performance report 2016]</ref>. | ||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 09:51, 10 November 2022
Ribblesdale Cement Kiln is located in Clitheroe and is owned by Hanson Cement.
Ribblesdale Cement Kiln | |
See Cement Kilns → page for a larger UK Wide map. | |
Waste Licence | BL7272IB |
Operator | Hanson Cement |
Parent Company | Heidelberg Cement Group |
Clinker Capacity | 0.75 Mt |
Summary site information collated from a variety of sources.
Overview
WikiWaste has used the website Cement Plants and Kilns in Britain and Ireland[1] extensively for the reference material for each individual cement kiln page. The detail on this reference website is extensive and as WikiWaste is focused upon the UK waste and resource market, only the key highlights are captured from this website (and company websites accordingly) to provide background and context. Ribblesdale started manufacturing clinker in 1936 and up to 2015 had produced 55 million tonnes of clinker through 7 rotary kilns over this period.
Ownership
- 1936 to 1986 Ribblesdale Cement Ltd (50% owned by Tunnel, 50% by Thomas W Ward to 1981, then by Rio Tino Zinc (RTZ))
- 1986 to 2009 Castle cement Ltd (RTZ to 1989, Scancem to 1999, HeidlebergCement to 2009)
- 2009 to Present Hanson Cement UK (owned by HeidelbergCement)
The Process at Ribblesdale
The process at the site is an air-separated precalciner kiln, supplied by FLS (FLSmidth) which allows for the burning of alternative fuels[2].
Raw Materials
The primary raw materials are Carboniferous Limestone from the adjacent quarry, using interlaced shale on the same site and superficial clay. The query SELECT "updated" FROM "db_ea"."ea_desc_in" WHERE epr='BL7272IB' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_desc_in" WHERE epr='BL7272IB' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, EWC List
The table shows a list of the Waste for the Permit BL7272IB, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is the most current. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
EWC Code | Description | Tonnes In |
---|
Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit BL7272IB, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: 123,972.68t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|---|---|
19 02 08* | Lancaster | 15518.49 |
06 02 01* | Cheshire West and Chester | 2000.45 |
16 08 04 | Southampton | 904.16 |
19 12 10 | Stockton-on-Tees | 7524.95 |
19 08 13* | Salford | 2130.73 |
10 02 13* | Yorks & Humber | 4651.07 |
16 08 04 | Lincolnshire | 1192.72 |
19 12 11* | Cambridgeshire | 460.27 |
10 01 02 | Northern Ireland | 44143.50 |
19 12 11* | Nottinghamshire | 126.98 |
19 12 10 | Lancashire | 44177.84 |
02 02 03 | Lancashire | 198.58 |
16 08 04 | North East Lincolnshire | 942.94 |
Just under 40% of the tonnage listed is used for the primary purpose of substituting fuel requirements in the plant, with 55% of coal fly ash (also called Pulverized Fuel Ash or PFA) used as a replacement for raw material in the production process. The most recent annual performance report from 2016 did not report the exact tonnage used - quoting commercial confidentiality[3].