Stoke-on-Trent EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
No edit summary
Line 1: Line 1:
{{#vardefine: epr|QP3234SX}}
{{#vardefine: epr|WP3341QV}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum.