Millerhill EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
add page specific text |
||
| Line 16: | Line 16: | ||
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | ||
==Local Authority Data== | |||
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste. | |||
{{EAIn|EPR={{#var: epr}}}} | {{EAIn|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||