Glasgow Renewable Energy and Recycling Centre (ACT): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
add page specific text
 
Line 11: Line 11:
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2013 (with a 2016 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was terminated due to 'repeated delays', and was completed by [[Doosan Babcock]] in late summer 2019. Originally estimated to cost £154m by Viridor, they reported an over run of £95m <ref>[https://www.mrw.co.uk/latest/viridor-to-lose-95m-on-its-glasgow-efw-project/10029534.article MRW Article]</ref>,. Due to the accumulated losses by [[Interserve]] on this project and the [[Sinfin Lane]] project led to [[Interserve]] exciting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref>
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2013 (with a 2016 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was terminated due to 'repeated delays', and was completed by [[Doosan Babcock]] in late summer 2019. Originally estimated to cost £154m by Viridor, they reported an over run of £95m <ref>[https://www.mrw.co.uk/latest/viridor-to-lose-95m-on-its-glasgow-efw-project/10029534.article MRW Article]</ref>,. Due to the accumulated losses by [[Interserve]] on this project and the [[Sinfin Lane]] project led to [[Interserve]] exciting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref>


{{EfWLAData|EPR={{#var: epr}}}}
==Local Authority Data==
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste.
{{EAIn|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}