Environmental Permitting (England and Wales) (Amendment) Regulations 2023: Difference between revisions

Northern Chick (talk | contribs)
mNo edit summary
Northern Chick (talk | contribs)
links
Line 16: Line 16:
* it solely undertakes the processing or sorting of [[Waste Electrical and Electronic Equipment]] ([[WEEE]]), waste [[batteries]] or accumulators.
* it solely undertakes the processing or sorting of [[Waste Electrical and Electronic Equipment]] ([[WEEE]]), waste [[batteries]] or accumulators.
* it solely undertakes the processing and sorting of [[Residual Waste|residual waste]].
* it solely undertakes the processing and sorting of [[Residual Waste|residual waste]].
=== Examples of materials facilites ===
Facilities likely to be considered MFs include
* materials recovery facilities (MRFs) sorting household dry recyclables
* [[Commercial and Industrial Waste]] facilities that receive [[waste]] material to consolidate or sort into specified output materials
* [[Waste Transfer Station|Waste Transfer Stations]] (WTS) that receive waste material to consolidate or sort into specified output materials


==References==
==References==
</references>
</references>