Boston Energy Production Facility: Difference between revisions
No edit summary |
link to news story |
||
| Line 6: | Line 6: | ||
==Summary== | ==Summary== | ||
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]]<ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>. | Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]]<ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref> and was reported in November 2024 as being close to being mothballed [https://www.mrw.co.uk/news/aviva-to-pull-plug-on-three-failed-efws-28-11-2024/] | ||
==Plant== | ==Plant== | ||