MRF Regulations: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
Line 83: Line 83:
* only consolidate [[waste]] material from a single supplier into bulked outputs
* only consolidate [[waste]] material from a single supplier into bulked outputs
* do not prepare the material for [[reuse]] or [[Recycling|recycing]]
* do not prepare the material for [[reuse]] or [[Recycling|recycing]]
== Input sampling, measuring and recording<ref name=":0" /> ==
As a MF receiving 1,000 tonnes or more of [[Waste|waste]] material in 12 months and you meet the criteria above (as a facility within the scope of the new regulations) then sampling, measurement and recording of information by each individual supplier must be undertaken.
This involves measuring and recording the following:
* the total weight in tonnes of input [[Waste|waste]] material for each supplier during each reporting period
* the name and address of the supplier (or of each supplier) for each batch of material
* the date on which the batch of material was received, from which a sample has been taken
for '''input sampling''' the following information must be taken and recorded for '''each''' input sample:
* its composition in relation to the input sampling categories
* details of each supplier from whose inputs the sample was taken
* total weight in kilograms of each sample
* date the sample was taken
* details of the sampling methodology used to take a representative sample
In addition to measuring and recording the above, you also need to report:
* the total number of samples taken for each supplier
* the total weight of all samples


==Materials to be sampled - Incoming==
==Materials to be sampled - Incoming==