North Yard EfW (Devonport EfW CHP Facility): Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
| Line 12: | Line 12: | ||
==Plant== | ==Plant== | ||
Built by [[MVV Umwelts]]'s in-house contracting company with civil engineering support contract from [[Keir]] the construction started in mid 2012 and was delivered at a reported lifetime cost of GBP £389m<ref>[https://www.theconstructionindex.co.uk/news/view/kier-cleared-to-start-40m-devonport-incinerator Construction Index Article]</ref> and reported<ref>[https://resource.co/article/controversial-plymouth-incinerator-hits-full-operation-10758 Resource Article]</ref> capital cost of GBP £188m. | Built by [[MVV Umwelts]]'s in-house contracting company with civil engineering support contract from [[Keir]] the construction started in mid 2012 and was delivered at a reported lifetime cost of GBP £389m<ref>[https://www.theconstructionindex.co.uk/news/view/kier-cleared-to-start-40m-devonport-incinerator Construction Index Article]</ref> and reported<ref>[https://resource.co/article/controversial-plymouth-incinerator-hits-full-operation-10758 Resource Article]</ref> capital cost of GBP £188m. | ||
The plant comprises standard combustion technology, air cooled grate, generating super-heated steam <ref> | The plant comprises standard combustion technology, air cooled grate, generating super-heated steam by [[Standardkessel Baumgarte]]<ref>https://www.standardkessel-baumgarte.com/en/references/efw-power-plant-plymouth-great-britain</ref>. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] to deliver 24MWe of power. [[MVV Environmental]] openly publish their annual plant performance report <ref>[https://www.mvv.de/fileadmin/user_upload/Ueber_uns/en/geschaeftsfelder_1/environment_1/plymouth/linksanddownloads/annual_performance_reports/Annual_Performance_Report_MED_2018.pdf Annual Plant Performance Report]</ref> | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||